Fire Smoke Ventilation

Fire Smoke Ventilation


Specifications
Details

Fire Smoke Ventilation by EKG M&E Sdn Bhd

In the high-density urban landscape of KL and PJ, fire smoke ventilation is the most critical life-safety component of a building's M&E infrastructure. While standard air conditioning provides comfort, Fire Smoke Ventilation is engineered to manage toxic gases and extreme heat to allow for safe evacuation. EKG M&E Sdn Bhd specializes in the design and maintenance of these systems in full compliance with BOMBA and Uniform Building By-Laws (UBBL).


The Engineering of Smoke Management

Effective fire ventilation requires a "Total System" approach where fans, dampers, and sensors work in perfect synchronization.

1. Mechanical Smoke Spill (Extraction)

In a fire, smoke inhalation is the leading cause of casualties. We install high-capacity axial fans designed to "flush" the fire zone.

  • 10 Air Changes Per Hour (ACH): We engineer the system to meet the mandatory 10 ACH rate, rapidly removing toxic gases to maintain a "Clear Layer" (visibility) at the floor level.

  • High-Temperature Reliability: Our fans utilize Class H motors, certified to operate at 250°C for 2 hours.

2. Stairwell and Lift Lobby Pressurization

To keep escape routes 100% smoke-free, we utilize Positive Pressure.

  • The Pressure Shield: We pump fresh outdoor air into stairwells to maintain a pressure of 50 Pa. This ensures that when a fire door opens, air blows out, preventing smoke from entering the exit path.

  • VFD Response: We integrate Variable Frequency Drives (VFDs) that automatically ramp up fan speed when doors are opened, maintaining the air curtain effect without over-pressurizing the shaft when doors are closed.

3. Fire and Smoke Compartmentation

To prevent the HVAC ductwork from acting as a "highway" for fire, we install specialized barriers:

  • Motorized Fire & Smoke Dampers: Installed at fire-rated wall penetrations, these dampers are interlocked with the Main Fire Alarm Panel (MFAP) to snap shut instantly.

  • Fire-Rated Ducting: We utilize heavy-gauge or coated ducting (BS 476-24) to ensure the extraction path remains structurally sound under intense heat.


Compliance and Performance Metrics

System Feature UBBL / BOMBA Requirement EKG M&E Standard
Extraction Rate 10 ACH (Smoke Spill). High-Static Axial Performance.
Response Time Activation within 60 seconds. High-speed motorized actuators.
Pressurization 50 Pa (Stairwells). Calibrated Pressure Mapping.
Power Supply Secondary/Genset backed. Fire-rated cables and ATS.

Why Choose EKG M&E Sdn Bhd?

  • HVAC & Clean Air Specialist: We ensure your "Smoke Mode" logic is flawless. When the smoke fans activate, the general office AC must shut down to prevent the mechanical mixing of smoke into unaffected rooms.

  • Testing and Commissioning (T&C): We don't just "install and leave." We provide professional Smoke Visualization Testing and Differential Pressure Audits to prove your building is 100% safe before your annual Fire Certificate (FC) renewal.

  • Klang Valley Strategic Support: Based in Kuala Lumpur, we provide priority 24/7 maintenance and emergency response for smoke control systems across the Klang Valley.


View more about Fire Smoke Ventilation on main site